wiring laid down to pour the cement on
They've been busy again, and by Thursday had the wires down, then they poured the first two classrooms on Friday(I didn't get any pictures of that) and the other two classrooms on Saturday. I was going to head over both days at 3, but then it rained so hard, so on Saturday at 5 they were literally waiting for the cement to dry so that they could finish it off. I talked with them and snapped a few photos.
They also poured cement in the doorframes to fill in the gaps between the blocks and the metal frames. 
doorframe ready to pour cement



preparing cement seems to be a constant task

smoothing the cement in this room

this is the cement they were waiting to dry.

you won't be able to take a picture like this for much longer