you can kind of see the support poles and boards being used
as a base to hold the cement in place
|
However, you can see that the have got the beams cemented and the support posts are no longer in use meaning they are strong enough on their own.
They have been pouring the floor that will be the front of the classrooms on the second floor. There are boards held up from underneath by poles and the cement has to be lifted from the ground to the second floor by the bucketful, and then poured into a wheelbarrow to then be taken and put in place. This looks like a lot of tiring work to me, and I'm more than happy to be spending my days in the classroom and visiting them from time to time to snap some pictures.
the teamwork being used to lift the cement to the second floor
to be poured in place
|
I just love their system of using bamboo and wood boards
to hold things up
|
No comments:
Post a Comment