Flying blocks and stairs to the second floor

 I came to visit today and had to watch out for flying blocks, literally. It appears that their task for the day was to unload this load of blocks for the walls. The men in the truck were throwing the blocks from one to the other, and then down to the guy on the ground. After that it seemed to get a little gentler as they were handing and stacking them. I would not want to get in the way of one of those flying bricks.
Over at the building they were getting the second flight of stairs ready to pour, with the board down, metal in place, they were marking the steps out so that they would be even from top to bottom.
look at the block in mid flight...


marking the height for each step